Through our service consultations resolved, you may decide directly on our website many of their doubts and queries.
For urbanism can understand the phenomenon of the city and its sprawl.
It is a document that establishes the urban planning complete a municipality. From an overall plan can highlight the classification of the whole municipality in different kinds of terrain: urban, urbanization and not developed. It also provides detailed management in urban land, such as the soles of the existing buildings or future.
The minimum period of public exhibition of revising or drawing up a comprehensive plan is one month.
The overall plan must classify the land for development necessary for the development of the municipality within the duration of the p lan. In Andalusia, there is a limitation on the classification of land for development, not being able to classify as building land, unless it is for industrial use, over 40% of urban land, with some exceptions in small towns.
The most desirable is always part of the entity that will carry out such development, which will usually be a board of compensation.
In this case, means the license granted by administrative silence, although the commencement of works will require a notice to the council with at least ten days in advance. If the works do not conform to the general plan, municipalities as well as part of jurisprudence, often mean that there is silence.
It will be necessary to analyze many aspects, such as extenuating circumstances of the possible infringement or the possibility of legalization of all or part of the work.